At Scaftec safety comes first!
We firmly believe in ensuring that temporary access and support structures are designed not only to comply with current legislation but also that they are designed to be built in the safest, most efficient and cost-effective way. With the end goal being to provide a safe working area for the final users of the structure.
All our designs are subject to a rigorous and formal system of internal approval and sign off by qualified senior staff prior to being presented to our clients. By adhering to this procedure, we are confident that our final product is suitable and fit for purpose by our clients before we issue the working drawings to them.
We carry out independent checking of third party design drawings which can be used by contractors to ensure suitability prior to commencement of works. Category 2 or 3 checks are prepared to suit clients requirements.